One year has passed since AHF broke ground at the Speedway. On that sunny October day, surrounded by our partners and neighbors, we never imagined that such a gathering soon would be impossible. Had all gone as planned, the Speedway would have opened to the public this month. The courtyard would have bustled with families and friends mingling over Notch beer, enjoying outdoor music, and browsing local artisans’ wares. But like everyone else, we had to take a step back when the pandemic hit. We’ve weathered construction delays, endured market uncertainty, and thought long and hard about which aspects of the project are still feasible in the age of COVID. The answer: almost all of them. Our vision for the Speedway is still on track – just delayed and slightly altered to meet public health standards. We have some exciting updates to share with you as we gear up for a Spring opening!

1. Tenant Tours

Last Wednesday, AHF teamed with GraffitoSPBruner/Cott Architects, and Business Guide and entrepreneur Maggie Battista to host our first tour of the Speedway for prospective creative operators. Six small-format spaces in the former sheds and stables of Building E are available for short-term leases with food and beverage operators, small shops, makers, and artisans. We were blown away by the tour attendees’ enthusiasm for the site, and inspired by the creativity and tenacity they’ve exhibited in growing their businesses. The day came to a close with a surprise visit from State Representative Kevin Honan. Our next tour is scheduled for Monday, November 16. See our Call for Creative Operators for more details and to complete a Submission of Interest Form.

Prospective tenants on a tour of the Speedway
Prospective tenants listen to Bruner/Cott’s Christopher Nielson during a tour of the Speedway.
Kevin Honan, Sean McDonnell, and Gustavo Quiroga at the Speedway
Pictured from left to right: Representative Kevin Honan, AHF President Sean McDonnell, and GraffitoSP’s Gustavo Quiroga.

2. Storefronts and Doorways Galore

Nothing makes us feel that we’re nearing the end of construction more than seeing graffitied garage doors and boarded up entrances replaced with new glass. Notch’s taproom has received the first storefronts, while Garage B, the Speedway’s future event space, was outfitted with glass doors. We can’t wait to see how elegant the Speedway looks once the rest of the storefronts are in place!

New storefront at the Speedway
The Speedway is being outfitted with new doors and storefronts.

3. Speedway Shingle Style

Our friends at D.F. Pray General Contractors have awed us with their skill and patience in installing the Speedway shingles – one at a time, and entirely by hand. Their hard work is paying off. Siding is nearly complete at the Speedway, which looks better and better with each passing day. Though we loved the buildings’ old brown color, we decided to restore the property to its original unpainted appearance. The Eastern white cedar shingles will weather over time.

Shingles at the Speedway
Siding is nearly complete at the Speedway.

4. A Four-Season Courtyard

AHF always envisioned the Speedway as a place for people to enjoy themselves in all seasons, and we knew that a publicly accessible courtyard would be one of the site’s best features. Now that the pandemic has discouraged indoor gatherings, the courtyard has become more important than ever. We’re fitting out the courtyard for lamp posts and gas heaters so that visitors can use the space comfortably even in the dark and chill of late fall and winter. Who knew that a police station and racehorse stables could be so hygge?

A DF Pray worker attaches shingles to the Speedway
D.F. Pray has nearly completed the siding at the Speedway.

5. Something’s Brewing in the Speedway Brewery

The buildout of Notch’s brewery and taproom has begun! Turns out brewing beer requires some complicated plumbing. During the fermentation process, beer acidifies quickly and corrodes conventional cast iron drainage pipes. To transport byproduct from the operation safely off the premises, we dug deep trenches in the future brewery’s floor and installed a special lined cast iron pipe. We’ve also installed the lines from the brewery to the taproom, which will bring freshly made beer to Speedway visitors. All this work is now buried beneath a newly poured concrete floor, hidden from view.

Notch Brewery's space under construction at the Speedway
Notch is beginning to fit out its brewery and taproom at the Speedway.

Notch is beginning to fit out its brewery and taproom at the Speedway.

As ever, a big thank-you to the Brighton community for supporting this project over the past six years. The Speedway couldn’t have gotten this far without community members’ ideas, encouragement, and advocacy. We look forward to sharing more updates as the project comes together.

AHF president Sean McDonnell speaks with a community member at the Speedway.
AHF president Sean McDonnell speaks with a community member at the Speedway.

AHF president Sean McDonnell speaks with a community member at the Speedway.

Architectural Heritage Foundation is a 501(c)3 dedicated to stimulating economic development in disinvested communities through historic preservation. Follow AHF and its projects on FacebookTwitterInstagram, and LinkedIn.